So it was finally concrete day yesterday. It was 100 degrees out and I was glad I paid to have it done for me and also I don't have the skills to float a big ass slab.

Did a 30x15 section up by the house to get rid of a weed pit and add extra parking spot.
And finally a 10x20 slab in the back which I will eventually enclose and put the shop air compressor out there and various other items I don't want taking up room inside like chemicals and gas cans. I would have gone the whole distance in the back but the plumbing stubs for the shop plumbing come out there and I will probably need to put a waste pump there so it can push the bad stuff to the septic tank.