The original meter socket was directly under where the mast penetrates the roof. I moved the new 200 amp meter/main over to locate it behind the original 100 amp panel inside the garage (and to get the required clearance from the gas meter), and then put a large wire chase between the two panels.
I used the old panel (not a stab-lok) as a 50 amp sub-panel for the lighting circuits and a few outlets, and moved everything else into the new panel. I added a generator connection with a main breaker interlock, and a weatherproof utility outlet.
View attachment 599709
Fyi, I have worked with PG&E on many residential and commercial jobs and have always found them to be very easy to deal with (as long as you have your shit together... they aren't gonna wait around on you.) They will disconnect power at the weatherhead in the morning, then come back and reconnect it in the afternoon.
I've had a few times when, for whatever reason, I wasn't ready when they came back, so they just reschedule for the next day (I have actually gone ahead and reconnected it for the night myself and then disconnected the next morning before they got there... but I certainly wouldn't want to let them catch me doing that.)