Well, finally, after signing the contract back in MARCH of last year (over 18 months ago), the install is done. Still need the inspection and someone to explain it all to me. Also need someone to patch the small hole in the wall.
The Tesla batteries are finally done. Everything on this wall, except for the breaker box on the left, is new with the install. This is a combination of the Tesla stuff and the solar array. Four of the boxes are cutoff switches, one for each battery, and one for each string of panels (city requirement).
Now, of course, the best part is the day the crew finished we got a letter from SCE telling us that they'd made grid improvements that should better isolate us from the Public Safety Power Shutoffs (which was a motivator to get the system in the first place). All is not lost, as we'll be able to draw power from this thing all the time anyway.
Just funny.
How much$$?
How much$$$